Update for the Thomas Pink general layout plan following our stripping out, we will send a survey of the shell layout and we need a new drawing to show the shell structure, new stud partitions and critical lengths for the new perimeter furniture. This drawing will also need a typical section showing the construction of the new stud walls and there fixing (we will provide a description)
Update the ceiling drawing and construction details for the new light troughs.
An updated floor finishes plan shown on the updated floor layout plan mentioned above.
Update our shopfront drawings to show the fixing of the fascia and soffit – established when we can see the structure above following the strip out.